Hydel Projects

1.Existing Hydel Projects

U.B.D.C. HYDRO ELECTRIC POWER HOUSE STAGE I & II

Contact No. 0186-2345045, Mob. +91-96461-22229
Fax No. 0186-2345045
Email: seubdc@yahoo.co.in
Mailing Address: Dy.CE/O&M Circle UBDC, Malikpur, Pathankot. Pin code 145025

MUKERIAN HYDEL PROJECT STAGE – I

Contact No. 01883-236202, Mob. +91-96461-18758
Fax No. 01883-236202
Email: sehptalwara@gmail.com
Mailing Address: Dy.CE/O&M Circle MHP, PSPCL, Talwara. Pin Code 144216

ANANDPUR SAHIB HYDEL PROJECT (HEP)

Contact No. 01887-232117, Mob. +91-96461-18759
Fax No. 01887-232117
Email: se-gen-ashp@pspcl.in
Mailing Address: Dy.CE/Gen. Circle ASHP, PSPCL, Anandpur Sahib. Pin code 140118

RANJIT SAGAR DAM (HYDRO ELECTRIC PROJECT)

Contact No. 0186-263303, Mob. +91-96461-18756
Fax No. 0186-263303
Email: se-shahpur@pspcl.in, mukhtiarsinghangural@gmail.com
Mailing Address: Dy.CE/O&M Circle RSD, PSPCL, Shahpur Kandi. Pin Code 145029

SHANAN POWER HOUSE (HYDRO ELECTRIC PROJECT)

Contact No. 01908-222085, Mob. +91-97360-04242
Fax No. 01908-222085
Email: seshananph@gmail.com
Mailing Address: Dy.CE/Shanan Power House, PSPCL, Joginder Nagar, Mandi Pin Code No. 175015

2. Proposed Hydel Projects

SHAHPUR KANDI HEP (206 MW)

Contact No. 0175-2301578, Mob.: +91-96461-21114
Fax No.: 0175-2205249
Email : se-skpp@pspcl.in
Mailing Address:
Superintending Engineer/SKPP,
A-2, Shakti Vihar, PSPCL, Patiala.
Pin code -147001

UBDC PROJECT STAGE-III (85 MW)

Contact No.: 0175-2208139 Mob.: +91-96461-18754
Fax No.: 0175-2205249
Email : sehydelpatiala@yahoo.in
Mailing Address:
Superintending Engineer/Hyde Projects,
A-3, Shakti Vihar, PSPCL, Patiala.
Pin code-147001

3. MICRO HYDEL PROJECTS

To exploit small Hydro potential available at various falls in the Canals running in Punjab State , four Micro Hydel Projects have already been commissioned at Rohti, Thuhi, Daudhar & Nidampur.The detail of Micro Power Houses is given as under:

Sr. No Name of Micro Power Houses No. of Units Capacity of each unit (KW) Installed Capacity (KW) Year of commissioning
1. Nidampur 2 400 800 1985-86
2. Daudhar 3 500 1500 1987
3. Rohti 2 400 800 1989
4. Thuhi 2 400 800 1989
  1. Nidampur Power House is situated on Ghaggar branch Canal near Village Nidampur on Patiala-Sangrur Highway .
  2. Daudhar Power House is situated at Ajitwal-Badnikalan rural link road on Abohar branch Canal near Moga town.
  3. Rohti Power House is situated on Patiala-Nabha road at a distance of 19 KMs from Patiala on Ghaggar link Canal.
  4. Thuhi Power House is situated on Ghaggar branch Canal near village Thuhi at the distance from 4 KMs from Nabha Town.

TECHNICAL DATA:

a. Turbine KAPLAN (Horizontal Shaft)
b. Step-up Transformer 0.4/11 KV
c. Generator Type Horizontal Shaft
d. Water Head 9.84 ft. for 2X400 KW (Capacity) 13.12 ft. for 3X500 KW (Capacity)

GENERATION ACHIEVEMENTS (In MUs):

Sr. No. Year Nidampur Daudhar Rohti Thuhi Generation in (MUs)
1. 1990-91 2.454 4.555 0.405 2.639 10.053
2. 1991-92 2.783 5.251 0.692 3.031 11.757
3. 1992-93 3.351 4.381 0.428 3.459 11.619
4. 1993-94 1.538 3.121 0.291 1.692 6.642
5. 1994-95 2.575 4.232 0.467 1.754 4.028
6. 1995-96 2.079 4.444 0.801 2.061 9.385
7. 1996-97 2.345 4.708 0.937 1.796 9.786
8. 1997-98 0.863 3.578 0.738 1.784 6.963
9. 1998-99 2.044 4.429 1.259 2.139 9.869
10. 1999-00 2.108 5.482 1.175 2.602 11.367
11. 2000-01 2.066 5.513 0.703 2.132 10.414
12. 2001-02 2.409 4.641 0.559 2.078 9.687
13. 2002-03 1.894 4.186 0.874 2.009 8.963
14. 2003-04 2.652 4.965 0.071 2.189 9.877
15. 2004-05 1.066 1.251 0.015 1.226 3.558
16. 2005-06 1.78 2.53 1.64 1.01 5.96
17 2006-07 1.778 4.539    – 1.640 7.957
18 2007-08 1.542 4.352    – 1.105 6.999
19 2008-09 0.938 3.312    – 0.074 4.324
20 2009-10 0.75 2.22    –    – 2.97
21 2010-11 0.08 0.36    –    – 0.44
22 2011-12    –    –    –    –    –
23 2012-13    –    –    –    –    –
24 2013-14    –    –    –    –    –
25 2014-15    –    –    –    –    –
26 2015-16    –    –    –    –    –
27 2016-17    –    –    –    –    –

The Operation & Mtc. of all the four Micro Power Houses was handed over to M/S DSL Powers (P) Ltd., Ludhiana on lease basis for 10 (ten) years w.e.f. 11.07.05. The firm failed to restore generation in  Rohti Power House ,  Thuhi Power House was operated upto 30.11.2008 , Nidampur and Daudhar Power Houses were operated upto 31.5.2010. Due to various violations on the part of contractor, BODs of  PSPCL in its 10th meeting held on 13.4.2011, decided to terminate the O&M Contract Agreement no. 47 dt. 27.5.2004 signed with M/s DSL Powers, Pvt. Ltd., Ludhiana Accordingly the contract of the firm stands terminated and the projects are lying un-operational because the firm had refused to hand over the micro power houses back to PSPCL as per provisions of the contract. All the projects have been taken back from contractor. M/s PEDA showed its interest to take over these power houses. PSPCL decided to transfer these Power Houses to M/s PEDA at Market value of land of power houses + book value of Plant & Machinery of power houses whereas PEDA was interested to take over these power houses on collector value of land of power houses + book value of Plant & Machinery of power houses. Due to difference of opinion, ultimately the proposal was dropped. There after it was proposed to out-source these power houses to private contractor on 20 years lease basis at well defined PPA. CE/CD&C was entrusted to float tenders for out sourcing these power houses. TE No. ASE-1/MHPs/ROT/2015-16/01 was floated by SE/Civil hydel Design PSPCL, Chandigarh for leasing of all four No. Micro Hydel Projects. Price bids were opened on 29.04.2017. No bidder submitted bid for Rohti Power House on the plea of non availability of sufficient water discharge for Generation. After completing formalities, Lease Agreement for Thuhi, Nidampur and Daudhar were signed by Civil organization of PSPCL for transfer of these Micro Hydel Project to M/s Kotla Renewables Pvt. Ltd. “as is where basis” on dated 21, 22 & 23.12.2016 respectively. On 29.09.2017, Firm representative has informed that Daudhar, Nidampur and Thuhi Micro Hydel Project are expected be re-commissioned in December-2017, Feb-2017 & March-2017 respectively.