Installed Capacity & Generation

Position Ending 31.3.2015/2016/2017
Sr. No. Name of Project Detail of Power machines with installed capacity (MWs) Share of Punjab (MWs) Gross Generation during the year 2014-15 Gross Generation during the year 2015-16 Gross Generation during the year 2016-17
I. OWN PROJECTS
a.) HYDRO ELECTRIC PROJECTS
1. Shanan PHs 4X 15+1X50=110.00 110 507.8  532.37  472.87
2. UBDC 3X15+3X15.45 =91 91 383.88  320  341.05
3. Mukerian 6X15+6X19.5=207.00 207 1047.21  1169.45  1113.95
4. Anandpur Sahib 4X33.5=134.00 134 614.92  668.53  673.85
5. RSD 4X150=600.00 452.4 1864.97  1958.27  1306.13
6. Nadampur Micro 2X0.4=0.80 0.8 7.33 5.94 5.61
7. Daudhar Micro 3X0.5=1.50 1.5
8. Rohti Micro 2X0.4=0.80 0.8
9. Thuhi Micro 2X0.4=0.80 0.8
10. GGSSTP ROPAR(micro) 2×0.85 1.7
Total   1000.00 4426.11  4654.55  3913.46

 

b.) THERMAL PROJECTS No.& Capacity of units(MW) Total Capacity (MW) GROSS GENERATION during the year 2014-15 (Mus) GROSS GENERATION during the year 2015-16 (Mus) GROSS GENERATION during the year 2016-17 (Mus)
1. GNDTP, BATHINDA 2×120+2×110 =460.00 460 1432.74  918.30  691.66
2. GGSSTP, ROPAR 6×210 =1260.00 1260 5751.42  3959  2776.32
3. GHTP, Lehra Mohabat 2×210+2×250=920 920 4507.84  3134.83  2736.30
4. Auxilary Consumption    743.11  588.91
Net Thermal   2640 11692.00  7269.03  5622.37
Hydel 1000 4426.11  4616.39  3882.03
Total hydro +Thermal (a + b)   3640 16118.10  11885.41  9504.39
II. Share From BBMB Pojects 1161 3838.81  4294.72  3764.69
III. Import (Including Share from Central Sector Projects) 3610 21361.23  20776.21  21672.34
IV. Independent Power Producers (IPP) 2060 6685.80  10375.28  15605.96
V. Cogeneration (PEDA & Captive Power Plants & Jalkheri) 583 714.56  1082.19  1657.52
G.Total (I+II+III+IV)   11054 48718.50  48413.81  52204.9