U.B.D.C POWER HOUSES, STAGE-I & II (91.35 MW)
Upper Bari Doab Canal Hydro Electric Project (UBDC) is located near Pathankot in Punjab . There are three Power Houses situated on this Canal fed from Madhopur head Works on river Ravi. This Project comprises of two stages of Hydro Power stations. Both stages have one generating unit at each Power House having a generating unit of 15MW was commissioned during 1971-73. Stage-II of having a generating unit of 15.45 MW was erected and commissioned during 1989-92. The two stages of UBDC Hydro Electric Project have a total installed capacity of 91.35 MW.
The locations of Power Houses on the channel are as under: -
| Sr. No. |
Description |
UBDC Stage-I |
UBDC Stage-II |
1. |
Capacity |
3X15 = 45 MW |
3X15.45 = 46.35 |
2. |
RD/ Locations |
PH-I 13500 ft./Madhopur
PH-II 24750 ft./Sujanpur
PH-III 40000 ft./Sarna |
PH-I 13500 ft./Madhopur
PH-II 24750 ft./Sujanpur
PH-III 40000 ft./Sarna |
Salient features of the UBDC
| Sr. No. |
Description of the generating units |
UBDC Stage-I |
UBDC Stage-II |
1. |
Rating of each unit |
15 MW |
15.45 MW |
2. |
No. of units of each PH |
3 Nos. |
3 Nos. |
3. |
Manufacturer |
1 No. AEI ( UK )
2 No. BHEL |
All 3 No. BHEL |
4. |
Turbine out put |
21000 HP |
21340 HP |
5. |
Max Net Head |
18.3 M |
18.3 M |
6. |
Min. Net Head |
14.8 M |
14.8 M |
7. |
Rated Net Head |
17.1 M |
17.1 M |
8. |
Discharge required per m/c for max. Generation |
3625 Cs |
3625 Cs |
9. |
Type of turbine |
KAPLAN |
KAPLAN |
10. |
No. of Blades |
6 |
4 |
11. |
Dia. of Runner |
3962 mm |
3900 mm |
12. |
Generator Voltage |
11000 Volts |
11000 Volts |
13. |
Type of Generator |
Vertical Shaft |
Vertical Shaft |
14. |
Normal speed |
150 RPM |
166.7 RPM |
15. |
Direction of Rotation |
Clock wise |
Clock wise |
DETAIL OF STEP -UP TRANSFORMERS
| Power House |
No. of T/F both for stage -I &II |
Voltage Ratio in use. |
Different capacity in use.
(MVA) |
No(s) in each capacity size. |
Aggregate capacity MVA. |
P.H.1 |
2 |
11/132KV |
20
25 |
1
1 |
45 |
P.H.2 |
2 |
11/132KV |
16.667
20 |
1
1 |
36.667 |
P.H.3 |
2 |
11/132KV |
16.667
20 |
1
1 |
36.667 |
Total |
118.334MVA |
Commissioning dates of UBDC PHs
| Power House Number |
Stage-I |
Stage-II |
1 |
1. 30.08.1971 |
1. 06.08.1989 |
2 |
2. 24.05.1972 |
2. 26.06.1991 |
3 |
3. 12.04.1973 |
3. 01.01.1992 |
P.S.E.B (now PSPCL) had to incur an expenditure of 18.28 crore through Pb. Irrigation department for re-modelling of escape channel at RD- 72720 to enhance its capacity from 1500 Cusses to 7200 Cusses. This work was completed in 7/2004 due to which full generation from UBDC PHs became possible during lean period when Irrigation Indent is NIL. All the three old and sluggish governors of Stage-I machines have been replaced with the new Micro processor based governors at a cost of 3.07 Crore during the year 2010-11.
The case for capital mtc. of stage-I machine of power house no.1 is under process. The annual mtc. of machines is done regularly.
GENERATION ACHIEVEMENTS (In MUs):
| Year |
Actual Generation (In MUs) |
UBDC Stage-I |
UBDC Stage-II |
Total Generation (MU's.) |
1988-89 |
206.51 |
- |
206.51 |
1989-90 |
198.30 |
2.57 |
200.87 |
1990-91 |
152.91 |
47.82 |
200.73 |
1991-92 |
178.16 |
74.72 |
252.88 |
1992-93 |
144.83 |
122.81 |
267.64 |
1993-94 |
126.07 |
128.50 |
254.57 |
1994-95 |
133.75 |
154.00 |
287.75 |
1995-96 |
114.28 |
154.87 |
269.15 |
1996-97 |
131.84 |
142.37 |
274.21 |
1997-98 |
85.80 |
120.97 |
206.77 |
1998-99 |
131.07 |
124.83 |
255.90 |
1999-2000 |
137.35 |
181.42 |
318.77 |
2000-01 |
155.89 |
190.16 |
346.05 |
2001-02 |
114.11 |
206.28 |
320.39 |
2002-03 |
168.90 |
224.87 |
393.77 |
2003-04 |
190.90 |
236.54 |
427.44 |
2004-05 |
171.27 |
208.40 |
379.67 |
2005-06 |
250.14 |
280.49 |
530.63 |
2006-07 |
158.711 |
225.891 |
384.602 |
2007-08 |
184.281 |
243.751 |
428.032 |
2008-09 |
140.70 |
198.85 |
339.55 |
2009-10 |
142.00 |
194.60 |
336.60 |
2010-11 |
165.62 |
244.38 |
410.00 |
Note:
UBDC Stage-I&II Project achieved record generation of 530.62 MUs in the year 2005-06 since its commissioning. |