CHIEF ENGINEER/THERMAL DESIGNS

There are Five Directorates and One Accounts Office alongwith Works Section under the Admn. of

CE/Thermal Designs. The classification of work under each Directorate is as under: -

ELECTRICAL DIRECTORATE

To deal with the Main Electrical Equipment of GHTP Stage-II i.e. Turbine & Generator, Switch Yard

Control & Instrumentation (C&I), Transformers, Switchgears, Breakers, Isolators, Cabling, lighting etc.

MECHANICAL DIRECTORATE

Mainly to deal with Boiler its Auxiliaries and other allied works like Coal Handling Plant (CHP), Ash Handling

Plant (AHP), DM Plant, L.P. Piping, H.P. Piping, Fire Fighting & Protection Systems & Handling of Fly Ash etc.

CIVIL DIRECTORATE

To deal with Cooling Tower, Chimney, Ash Dykes, Raw Water System, Main Plant and other foundations &

piling etc.

PROJECT DIRECTORATE

To deal with the finalization of new thermal plants .

FLY ASH DIRECTORATE

To deal with the utilisation of Dry Fly Ash concerned with the three projects i.e. GNDTP Bathinda, GGSSTP

Ropar & GHTP Lehra Mohabbat.

ACCOUNTS OFFICE

To deal with the firms in respect of their payments and advance, besides financial aspects.

of Esstt. with different heads.

WORKS SECTION

This is an integrated part of Chief Engineer Office to assist for compiling information received from

all Directorates of Thermal designs as well as from Site Offices & administrative matters.

 

Annexure-A

 

1)

Name of the Project

Guru Hargobind Thermal Plant Stage-II

2)

Location

Lehra Mohabbat, Distt. Bathinda

3)

Installed Capacity unit wise

2 x 250 = 500 MW

4)

Type of Fuel

Coal

5)

Executing Agency

BHEL

6)

Clearances Status

Cleared by CEA, New Delhi. Investment approved by Planning Commission. All clearance obtained.

7)

Total estimated Cost

Rs. 2123 Crores (approx.)

8)

Synchronization dates

Unit-3 Commercial Operation Date (COD) 16-10-08

9)

Annual Generation at 68.5% load factor

3000 MU 2715 MU Net

10)

Coal consumption / year

1860000 Ton

11)

Cost of Generation

Rs. 3.17 (at Bus Bar).

12)

Latest Status

Order is placed on turnkey/EPC basis on BHEL on 31.03.04. Unit -3 COD 16-10-08.

 

 

 

 

 

 