I |
SHAHPUR KANDI HEP (206 MW) |
|
1) |
Location: |
The Project is to be executed on River Ravi. 11 KM downstream of Ranjit Sagar Dam and 7.8 KM upstream of Madhopur Head works. |
2) |
Main Features: |
It will provide a balancing Reservoir to ensure Uniform supply at Madhopur Head works and to enable Ranjit Sagar Power Plant to work as a peaking station. |
3) |
No of Power Houses: |
Two |
4) |
No. of Units: |
7 Nos. |
Power House -I |
3 Units of 33 MW each . |
Power House -II |
3 Units of 33 MW each and a mini unit of 8 MW. |
5) |
Total Generating Capacity |
3x33 + 3x33 + 1x8 = 206 MW |
6) |
Design Head: |
27.93 M |
7) |
Design Discharge: |
13600 Cusecs |
8) |
Type of development: |
Reservoir |
9) |
Commissioning |
Year 2016-17 |
10) |
Total Energy Contribution Annually: |
1043 MUs. |
11) |
Cost per unit: |
Rs. 3.38 |
12) |
Cost of the Project: |
Rs. 2285.81 Crore (4/2008 price level) |
13) |
Funds requirement: (Rs. In Crores) |
|
2010-11 |
2011-12 |
|
18.0 |
35.00 |
|
14) |
Clearances & present status: |
i) This project stands cleared by CEA, Ministry of Environment & Forest & Planning Commission. |
ii) MOA stands signed between PSPCL and PFC on 21.12.09 for availing loan of Rs. 1681.47 Cr. From PFC for which GOP has given guarantee.
iii) Appartionment of cost between PSPCL and Irrigation is in the ratio of 71.39% and 28.61%.
iv) NIT for appointment of consultant for E&M works was floated on dt. 04.05.11.The price bids were opened on 19.10.11. The draft memorandum seeking approval for issue of work order / contract to lowest tenderer is under consideration. |