IV

Proposed  Mukerian Hydel Project-III   (50 MW)

 

1)

Location

This project is proposed to be executed at tail race of Mukerian Hydel Channel-II before escaping into river BEAS at Harike Barrage.

2)

Main Features:

The Project will harness residual /balance potential energy of Mukerian Hydel Channel after Mukerian Hydel Project stage-II before falling into the river at Harike Barrage.

3)

No. of Power Houses.

4

(i)  Bhikhowal

(ii)  Gorsian    

(iii) Raipur Arian

(iv) Kishansinghwala

4)

No. of Units:

4 (1 each at above Power Houses)

5)

Total generating capacity

9+11+10+12= 42 MW

(i)  Bhikhowal - 9MW

(ii)  Gorsian  -   11MW

(iii) Raipur Arian - 10MW

(iv) Kishansinghwala- 12MW

6)

Gross /Design Head:

(i)  Bhikhowal - 4.2 m

(ii)  Gorsian  -  5.32m

(iii) Raipur Arian - 4.6m

(iv) Kishansinghwala- 5.51m

7)

Design Discharge:

(i)  Bhikhowal - 274 cumecs

(ii)  Gorsian  -  277.12 cumecs

(iii) Raipur Arian - 272.12cumecs

(iv) Kishansinghwala- 272.12cumecs

8)

Type of Development

Run of canal

9)

Commissioning:

Under Consideration

10)

Cost of Project:

Rs. 517 Crore ( 2011  level)

11)

Total Energy Contribution Annually

246.51MUs

12)

Cost per unit:

Rs.3.98

13)

Present Status

The pre-feasibility report prepared by AHEC Roorkee being very sketchy is being updated to determine the feasibility of the project.