INSTALLED CAPACITY & GENERATION

Position Ending 30.6.2011

S. No.

Name of Project

Detail of Power  machines with
installed capacity (MWs)

Share of  
Punjab(MWs)

Gross Generation during
the year 2011-12

I

OWN PROJECTS

 

 

 

a)

HYDRO ELECTRIC PROJECTS

0

 

 

1

Shanan PHs

4X 15+1X50=110.00

110
517.3

2

UBDC

3X15+3X15.45 =91.35

91.35
295.45

3

Mukerian

6X15+6X19.5=207.00

207
1357.75

4

Anandpur Sahib

4X33.5=134.00

134
807.13

5

RSD

4X150=600.00

452.4
1927.74

6

Nadampur Micro

2X0.4=0.80

0.8
4.49

7

Daudhar Micro

3X0.5=1.50

1.5

8

Rohti Micro

2X0.4=0.80

0.8

9

Thuhi Micro

2X0.4=0.80

0.8

10

GGSSTP ROPAR(micro)

2x0.85

1.7

 

Total

 

1000.350
4909.860

b)

THERMAL PROJECTS

No.& Capacity of
units(MW)

Total Capacity
(MW)

GROSS GENERATION
during the year 2011-12

1

GNDTP, BATHINDA

4X110 =440.00

440.000
1883.01

2

GGSSTP, ROPAR

6X210 =1260.00

1260.000
9563.96

3

GHTP, Lehra Mohabat

2x210+2x250=920.00

920.000
7621.26

 

Total Thermal

 

2620.000
19068.230

 

Hydel

----

1000.000
4909.860

 

Total hydro +Thermal (a + b)

 
3620.350
23978.090

II

Share From BBMB Pojects

 

1163.000
4896.440

III

Import (Including Share from Central Sector Projects)

 

1933.000
15501.460

IV

Cogeneration (PEDA & Captive Power Plants & Jalkheri)

 

184.000
442.750

 

G.Total (I+II+III+IV)

 

6900.350
44818.740