INSTALLED CAPACITY & GENERATION
Position Ending 30.6.2011 |
S. No. |
Name of Project |
Detail of Power machines with
installed capacity (MWs) |
Share of
Punjab(MWs) |
Gross Generation during
the year 2011-12 |
I |
OWN PROJECTS |
|
|
|
a) |
HYDRO ELECTRIC PROJECTS |
0 |
|
|
1 |
Shanan PHs |
4X 15+1X50=110.00 |
110 |
517.3 |
2 |
UBDC |
3X15+3X15.45 =91.35 |
91.35 |
295.45 |
3 |
Mukerian |
6X15+6X19.5=207.00 |
207 |
1357.75 |
4 |
Anandpur Sahib |
4X33.5=134.00 |
134 |
807.13 |
5 |
RSD |
4X150=600.00 |
452.4 |
1927.74 |
6 |
Nadampur Micro |
2X0.4=0.80 |
0.8 |
4.49 |
7 |
Daudhar Micro |
3X0.5=1.50 |
1.5 |
8 |
Rohti Micro |
2X0.4=0.80 |
0.8 |
9 |
Thuhi Micro |
2X0.4=0.80 |
0.8 |
10 |
GGSSTP ROPAR(micro) |
2x0.85 |
1.7 |
|
Total |
|
1000.350 |
4909.860 |
b) |
THERMAL PROJECTS |
No.& Capacity of
units(MW) |
Total
Capacity
(MW) |
GROSS GENERATION
during the year 2011-12 |
1 |
GNDTP, BATHINDA |
4X110 =440.00 |
440.000 |
1883.01 |
2 |
GGSSTP, ROPAR |
6X210 =1260.00 |
1260.000 |
9563.96 |
3 |
GHTP, Lehra Mohabat |
2x210+2x250=920.00 |
920.000 |
7621.26 |
|
Total Thermal |
|
2620.000 |
19068.230 |
|
Hydel |
---- |
1000.000 |
4909.860 |
|
Total hydro +Thermal (a + b) |
|
3620.350 |
23978.090 |
II |
Share From BBMB Pojects |
|
1163.000 |
4896.440 |
III |
Import (Including Share from Central Sector Projects) |
|
1933.000 |
15501.460 |
IV |
Cogeneration (PEDA & Captive Power Plants & Jalkheri) |
|
184.000 |
442.750 |
|
G.Total (I+II+III+IV) |
|
6900.350 |
44818.740 |
|