UBDC PROJECT STAGE - III (85MW)

 

1)

Location

UBDC Hydel Channel Stage-III will take off at RD 65000 (left) of UBDC Main & will  fall into River Beas Down Stream Shally Pattan.

2)

Main Features:

Two Power Houses shall be set up giving additional Installed Capacity of 85 MUs.

3)

No. of Power Houses.

2

4)

No. of Units:

 PH-I = 3 Units 
 PH-II =2 Units

5)

Total generating capacity

3x16.4 + 2x18 = 85 MW

6)

Gross Head:

 PH -I = 17.03 M
 PH-II =23.195M

7)

Type of Development

Run off River

8)

Commissioning:

By the end of 2015-16

9)

Cost of Project:

Rs. 1088 Crore ( 2009  level)

10)

Total Energy Contribution Annually

510 MUs

11)

Cost per unit:

Rs. 2.49

12)

Present Status

Project stands allocated to M/s Bhilwara Energy Ltd.Noida  for its execution on BOOT basis at agreed tariff of Rs..2.49 per Kwh.