II |
UBDC PROJECT STAGE - III (85MW) |
|
1) |
Location |
UBDC Hydel Channel Stage-III will take off at RD 65000 (left) of UBDC Main & will fall into River Beas Down Stream Shally Pattan. |
2) |
Main Features: |
Two Power Houses shall be set up giving additional Installed Capacity of 85 MUs. |
3) |
No. of Power Houses. |
2 |
4) |
No. of Units: |
PH-I = 3 Units
PH-II =2 Units |
5) |
Total generating capacity |
3x16.4 + 2x18 = 85 MW |
6) |
Gross Head: |
PH -I = 17.03 M
PH-II =23.195M |
7) |
Type of Development |
Run off River |
8) |
Commissioning: |
By the end of 2015-16 |
9) |
Cost of Project: |
Rs. 1088 Crore ( 2009 level) |
10) |
Total Energy Contribution Annually |
510 MUs |
11) |
Cost per unit: |
Rs. 2.49 |
12) |
Present Status |
Project stands allocated to M/s Bhilwara Energy Ltd.Noida for its execution on BOOT basis at agreed tariff of Rs..2.49 per Kwh. |